Welspun Road Infra Private Ltd.
Welspun Road Infra Private Ltd.
Welspun Road Infra Private Ltd.
The project upgraded an intermediate lane road to a modern two-lane road, enhancing traffic safety and efficiency while improving overall road network sustainability. Linking newly developed roads to NH-56 increased connectivity between villages and the district headquarters, easing logistical hurdles for farmers transporting produce to Maharashtra’s larger cities. The project was concluded safely and punctually despite obstacles like rugged terrain, forest zones, limited work hours, wildlife concerns, and remote material transportation.
The project upgraded an intermediate lane road to a modern two-lane road, enhancing traffic safety and efficiency while improving overall road network sustainability. Linking newly developed roads to NH-56 increased connectivity between villages and the district headquarters, easing logistical hurdles for farmers transporting produce to Maharashtra’s larger cities. The project was concluded safely and punctually despite obstacles like rugged terrain, forest zones, limited work hours, wildlife concerns, and remote material transportation.
The project upgraded an intermediate lane road to a modern two-lane road, enhancing traffic safety and efficiency while improving overall road network sustainability. Linking newly developed roads to NH-56 increased connectivity between villages and the district headquarters, easing logistical hurdles for farmers transporting produce to Maharashtra’s larger cities. The project was concluded safely and punctually despite obstacles like rugged terrain, forest zones, limited work hours, wildlife concerns, and remote material transportation.
Value created
Value created
Value created
362.53 Kms
362.53 Kms
362.53 Kms
(Cumulative length of 9 packages)
(Cumulative length of 9 packages)
(Cumulative length of 9 packages)
Road upgradation
Road upgradation
Road upgradation
100%
100%
100%
Completed
Completed
Completed
Our Projects
Our Projects
Our Projects
01
NXT-INFRA CGRG Highways Limited
Project Length: 53.3 kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project Length: 53.3 kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project Length: 53.3 kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project Length: 53.3 kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project Length: 53.3 kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project Length: 53.3 kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project Length: 53.3 kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project Length: 53.3 kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project length: 53.3 Kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project length: 53.3 Kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project length: 53.3 Kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
01
NXT-INFRA CGRG Highways Limited
Project length: 53.3 Kms
Key Feature: Improving the connectivity of several towns and villages in the state of Uttarakhand with four-laning of the Chutmalpur-Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Gagalheri section of NH-73.
Completion: 100%
02
Welspun Intrafacility Private Limited
Project length: 70.5 Kms
Key Feature: Reducing the travel time from Delhi to Panipat by 60% by eight-laning the section of new NH-44 from Mukarba Chowk at Km. 15+500 to Panipat Km. 86+000 in the State of Haryana.
Completion: 97%
03
NXT-Infra GSY Highways Limited
Project length: 51.455 Kms
Key Feature: Improving the connectivity of towns with the four-laning of the Gagalheri-Saharanpur-Yamunanagar section of NH-73 in Uttar Pradesh and Haryana.
Completion: 100%
04
Delhi-Meerut Expressway Private Limited
Project length: 8.716 Kms
Key Feature: Completed in a record time of 19 months, this landmark project is a key connector between Delhi and Meerut. It has been conferred with several prestigious awards, including a Gold Award in 2022 for Excellence in Project Management by the Ministry of Road Transport and Highways.
Completion: 100%
05
Chikhli-Trasod Highways Private Limited
Project length: 62.7 Kms
Key Feature: A crucial link in the 593 km Nagpur-Surat Economic Corridor, the existing highway has been upgraded to a modern, 4-lane corridor, reducing travel time from Chikhali to Tarsod by 71%.
Completion: 100%
Corporate Address
Office no. 501, Vikas Hub, Vikas Center, Next to
Cubic Mall, Dr. C. G. Road, Wadavali Village, Chembur (East),
Mumbai – 4000074.
Registered Office
Unit No. S-39, 2nd Floor, ‘Vasant Square Mall’
Plot No. A, Community Centre, Pocket V, Sector-B, Vasant Kunj,
New Delhi-110070.
Email address
info@nxt-infra.com
2024. NXT-Infra All Rights Reserved.
Corporate Address
Office no. 501, Vikas Hub, Vikas Center, Next to
Cubic Mall, Dr. C. G. Road, Wadavali Village, Chembur (East),
Mumbai – 4000074.
Registered Office
Unit No. S-39, 2nd Floor, ‘Vasant Square Mall’
Plot No. A, Community Centre, Pocket V, Sector-B, Vasant Kunj,
New Delhi-110070.
Email address
info@nxt-infra.com
2024. NXT-Infra All Rights Reserved.